Advanced MEMBranes & membrane assisted procEsses for pre- and post- combustion CO2 captuRe
- 2018-2021
- https://member-co2.com
PROJECT SCOPE
To demonstrate currently state-of-the-art capture technologies in industrially relevant environment.
To scale-up & manufacture advanced materials and to prove their added value in industrially relevant conditions (TRL 6) in novel membrane based technologies that outperform current technologies for pre- and post-combustion CO2 capture in power plants as well as H2 generation with integrated CO2 capture.
CENER ROLE
To demonstrate the pre-combustion CO2 capture technology at the BIO2C facilities biomass gasifier (atmospheric 2MWth bubbling fluidized bed (BFB)).
The prototype will be tested for at least 550 h to deliver robust demonstration of the prototype performance in relevant conditions for pre-combustion CO2 capture.